Share This Post:

Baker Condominiums Continues Construction at Healthy Pace

Click Below to Watch The Newest Aerial Video of Baker Condominiums

 

 

Construction on the Baker Condominiums building has been progressing faster than expected. Wood framing and truss work is being finished up while doing some preparatory work on roofing.

Main Street has been paved with most of the exterior concrete work being wrapped up. Windows are beginning to be installed.

Aesthetically pleasing exterior siding is being put into place. Beautiful exterior masonry work is underway. Which will give the building a classic and appealing accentuation.

Electrical and Plumbing are being roughed in along side HVAC (Heating, Ventilation, and Air Conditioning) all of which are passing 50 percent completion.

Comments are closed.